No items found.
Dolphin Access Walkway Replacement and Piling
Budget AUD$3.9M
Deconstruction, Marine Piling, Structural
Project details
- Removal of three existing pile groups, utilising dive and surface teams
- Installation of three 900mm diameter piles and pile caps
- Replacement of eight 25m dolphin access walkways